Equinix colocation pricing is not published as a public rate card. Quotes are custom and depend on the metro, the cabinet’s power draw cap (kVA), the contract term and how many interconnections you buy. The best public benchmark is Equinix’s own investor reporting: in Q1 2026, average monthly recurring revenue (MRR) per billed cabinet was $2,524, up 7% year over year. That number is a fleet-wide average, not a quote, but it tells US buyers roughly what Equinix earns from a typical cabinet each month.
This guide sets out what the public record says about how Equinix charges for space, power, cross connects and Equinix Fabric. It explains how to read the averages, and it shows where buyers have room to negotiate. For market-wide numbers across all providers, see our colocation pricing guide for 2026.
Why there is no Equinix colocation price list
Equinix sells retail colocation, meaning cabinets and cages, through quotes. Its FY2025 annual report says infrastructure offerings are “typically billed based on the space and power a customer consumes” under fixed-duration contracts, while interconnection is billed on the customer’s outbound connections. Both generate monthly recurring revenue. The same filing describes a footprint of 280 data centers in 77 markets across 36 countries with more than 500,000 interconnections. A single price list would not fit that range of metros.
Equinix’s own product documentation follows the same pattern. The pricing pages for cross connects and Equinix Fabric describe what is billed and how, but they give no list prices. For Fabric, Equinix points customers to a pricing calculator inside its customer portal.
Equinix colocation pricing: what the public data shows
Three sets of public data are useful. The first is Equinix’s quarterly disclosures. The second is its technical documentation, which defines the units you are billed in. The third is independent market research on overall colocation pricing trends.
1. MRR per cabinet: the fleet-wide average
Equinix reports MRR per cabinet as a yield metric. In Q1 2026 it was $2,524, and management attributed the growth to firm pricing and higher density. On the Q4 2025 call, the CFO said this yield was “stepping up $65 quarter-over-quarter”, driven by pricing, density and interconnection attach rates.
Read the number with care:
- It is an average of recurring revenue per billed cabinet. That covers more than space and power, because interconnection attach is one of the drivers management cites.
- It blends every region, every cabinet size and every contract vintage. A new high-density cabinet in a constrained US metro can price well above it, and a small legacy deployment can price below it.
- It leaves out one-time charges such as installation fees.
2. Pricing direction: firm, with renewal increments
Equinix’s management has described pricing as firm for several quarters running. On the Q4 2025 call, the CEO said the company saw “very firm pricing throughout Q4 across all segments and for all regions”. She also said most contracts auto-renew with a pricing increment applied. In Q1 2026, management said pricing “remains firm whether we are looking at pre-sales or bookings within the quarter”. For buyers, the auto-renewal increment matters more than the opening rate. It belongs in the first negotiation, not the renewal.
3. Market backdrop: tight supply in primary US markets
Equinix’s pricing power sits inside a tight North American market. CBRE’s H1 2026 North America Data Center Trends report found that primary-market vacancy fell to a record low of 1.4%, with Northern Virginia at 0.2%. Asking rates for the 250–500 kW tier rose 4.3%. CBRE’s figures cover wholesale-scale requirements of 250 kW and up, not single retail cabinets, but they show the supply conditions every retail provider is pricing against.
How Equinix bills each component
The table below summarizes how each part of an Equinix deployment is charged, based on Equinix’s documentation. Equinix publishes no list prices for these items, so the table covers the billing model only.
Need Expert Guidance?
Talk to a Data Center Expert
21+ years of hands-on experience in data center design, operations & infrastructure. Book a quick discovery call to discuss your project.
📞 Book a Discovery Call| Component | How it is billed | Term notes | Public price? |
|---|---|---|---|
| Cabinet space and power | Monthly recurring, based on space and power. Power is contracted as a draw cap in kVA (source) | Fixed-duration contract | No. Fleet average MRR per cabinet was $2,524 in Q1 2026 |
| Power above the draw cap | “Usage over the draw cap will incur additional charges” (source) | May require a contracted capacity increase | No |
| Standard cross connect | One-time installation fee (NRC) plus monthly recurring charge (MRC) (source) | Follows colocation terms. Early termination requires a deinstallation fee | No |
| Intra-customer cross connect | NRC only, no MRC (source) | n/a | No |
| Fabric port | Monthly, no upfront fees. Varies by speed (1/10/100 Gbps), type and package (source) | Standard ports co-terminus with cage. Remote/Extended ports have a 12-month minimum | No. Use the portal calculator |
| Fabric virtual connection | Flat monthly fee for provisioned bandwidth, billed daily on the A-side (source) | Inter-metro: on demand or 12/24/36 months. Local: on demand only | No |
The power details that drive your bill
Power is the line item buyers most often misread. In Equinix’s model, the draw cap is a contractual limit on total customer load, measured in kVA. Power is delivered through redundant pairs of AC circuits. In the Americas, the usable share of a circuit is 80% of its size for 120/208V circuits and 100% for 240/415V circuits. Equinix’s example is a 2 kVA standard cabinet in AMER, fed by a 30 A single-phase circuit with 2.88 kVA usable.
For its standardized Secure Cabinet Express product, Equinix documents a 45U+ cabinet with a draw cap selectable in 0.5 kVA increments. Draw caps of 5 to 7 kVA are pre-approved, and higher densities need a capacity feasibility review. In practice, that gives US buyers a simple framing: the kVA you commit to is the main variable in your quote, and density above roughly 7 kVA per cabinet triggers an engineering review before Equinix will price it.
Equinix’s April 2026 community update adds two billing details. For metered power, conversions use 730.5 hours per standard month, and the PUE applied is a 12-month trailing average. If you are offered a metered option, ask which PUE figure will apply and how often it is recalculated.
What drives an Equinix quote up or down
- Metro. Constrained markets such as Northern Virginia have very little vacancy (0.2% per CBRE), which supports higher rates.
- Draw cap. Higher kVA raises the monthly charge. Overages are billed on top.
- Term length. For Fabric, Equinix states that “longer term commitments receive higher discounts”. Fabric terms auto-renew unless cancelled 90 days before the end of the term.
- Interconnection count. Each standard cross connect adds an NRC and an MRC. On a cabinet with many carriers, these can add up to a large share of the bill.
- Renewal increment. Most contracts auto-renew with a price increment, so the escalator clause matters as much as the starting rate.
How to choose: is Equinix the right fit, and how do you negotiate?
Equinix’s premium comes from its interconnection ecosystem: carriers, cloud on-ramps, and partners reachable by cross connect or Fabric. If your deployment is mostly compute with one or two carriers, a provider with a thinner ecosystem may meet the same technical need for less. Compare options in our colocation providers comparison, and model the full cost against building or using cloud with our build vs buy vs colocation ROI calculator.
If Equinix is on your shortlist, use this checklist before you sign:
- Get every component as its own line. Ask for space and power, each cross connect NRC and MRC, Fabric ports and Smart Hands rates separately, so you can compare quotes like for like.
- Size the draw cap to your measured load. Overages are billed and can force a contract change. Over-committing means paying for unused capacity.
- Negotiate the renewal escalator now. Because contracts auto-renew with an increment, ask for a cap in writing.
- Check circuit voltage. In the Americas, 240/415V circuits allow 100% of circuit size against 80% for 120/208V, which affects how much usable power each circuit delivers.
- Price Fabric against physical cross connects. For cloud and partner links, compare on-demand and term Fabric virtual connections with physical cross connects using the portal calculator.
- Benchmark against the averages. Equinix’s average MRR per cabinet is a rough sanity check. A quote far above it for a standard-density cabinet deserves a closer look at what is bundled. Our free data center tools can help with power and capacity math.
Frequently asked questions
How much does an Equinix cabinet cost per month?
Equinix does not publish cabinet prices. Its fleet-wide average MRR per billed cabinet was $2,524 in Q1 2026. That average includes interconnection-related revenue and blends all regions, so your quote will depend on metro, kVA and term.
Does Equinix charge for cross connects every month?
For most products, yes. Standard, campus and extended cross connects carry a one-time installation fee plus a monthly recurring charge. Intra-customer cross connects, which link your own cages, are NRC only.
What happens if I exceed my power draw cap?
Equinix says usage over the draw cap incurs additional charges. It may also ask you to increase contracted capacity or reduce load.
Is Equinix Fabric cheaper than a physical cross connect?
It depends on bandwidth, distance and term. Fabric virtual connections are a flat monthly fee for provisioned bandwidth, billed daily, and on-demand orders can be cancelled at any time. Price both options in the Equinix portal calculator for your actual links.
Are Equinix prices going up?
Management has described pricing as firm across regions, and most contracts auto-renew with a pricing increment. With US primary-market vacancy at a record low 1.4%, buyers should expect little downward pressure in 2026.
Need help benchmarking an Equinix quote or comparing it with alternatives? Talk to our data center consulting team.
Sources
- Equinix Q1 2026 earnings call transcript (The Motley Fool)
- Equinix Q4 2025 earnings call transcript (The Motley Fool)
- Equinix FY2025 annual report (Form 10-K)
- Equinix Docs: Colocation power
- Equinix Docs: Secure Cabinet Express architecture and power
- Equinix Docs: Cross Connect pricing and billing
- Equinix Docs: Fabric pricing, billing and terms
- Equinix Docs: Fabric port pricing
- Equinix Community: Power allocation, usage and policy update (April 2026)
- CBRE: North America Data Center Trends H1 2026
Written by
Raajeev Ratra
Data Center Infrastructure Expert | 21+ Years in DC Design, Operations & Project Management
Raajeev is a seasoned data center professional with hands-on experience in hyperscale facilities, colocation design, power & cooling infrastructure, and global DC operations. He shares practical insights to help engineers and IT leaders build better infrastructure.